2022 Construction Projects
Sullivan Road/Wellesley Avenue Intersection Improvements
Timeline: Completed
Description: This project will replace the existing 4-way stop controlled intersection with a traffic signal. Improvements also include road widening, improved pedestrian facilities, and stormwater improvements. The project has been combined with Spokane County’s Bigelow Gulch Phase 6 to minimize disruption to the public and reduce costs.
Estimated cost: $2.3 million. The city’s contribution to the project is approximately $1.2 million with the remainder covered by Spokane County.
LEARN MORE
Sprague Avenue/Barker Road Intersection Improvements
Timeline: Completed
Description: The project will replace the existing 4-way stop controlled intersection with a single lane roundabout. This project includes reconstruction of the intersection, storm drainage improvements, enhanced pedestrian facilities, lighting, and landscaping improvements.
Estimated cost: $2.3 million
LEARN MORE
Barker Road at Union Pacific Crossing (Phase I – Shared Use Path)
Timeline: Completed
Description: This project constructed a 10-foot asphalt path for pedestrians and cyclists on the east side of Barker Road between the Spokane River and Euclid Avenue.
Estimated cost: $500,000
Buckeye Sewer Extension
Timeline: Completed
Description: This project installed a new sewer line on Buckeye Avenue from McMillan Road to the city limits.
Estimated cost: $750,000
Evergreen Road Preservation (Broadway to Mission)
Timeline: Completed
Description: This project grinded and overlayed Evergreen Road from Broadway Ave. to Mission Ave. and included pavement patching, installing ADA compliant ramps and ITS conduit.
Estimated cost: $1.4 million
Wilbur Road Sidewalk
Timeline: Summer 2022 (July – August)
Description: This project will involve installing sidewalk on the east side of Wilbur Road between Boone Avenue and Mission Avenue. Road will be closed to through traffic during construction.
Estimated cost: $800,000
Sullivan Park Waterline
Timeline: Summer 2022 (July – August)
Description: This project will install waterline on the west side of Sullivan Road to connect Sullivan Park to the Trentwood Irrigation District.
Estimated cost: $526,000
Sprague Avenue Preservation (Havana to Fancher)
Timeline: Completed
Description: This project involves patching asphalt, grind and inlay, adding ADA ramps, ITS conduit installed on Sprague Avenue between Havana Road and Fancher Road. Traffic impacts include lane closures during the day, I-90 ramp closures and road closures at night in August.
Estimated cost: $2.5 million
LEARN MORE
Mission Avenue Over Evergreen Road - Bridge Deck Repair
Timeline: Summer 2022 (August)
Description: This project will repair the bridge deck on Mission Avenue over Evergreen Road. Traffic impacts will require reduced traffic on the bridge during construction.
Estimated cost: $260,000
Barker Road/BNSF Grade Separation Project
Timeline: Project continues through fall 2022
Description: The Barker Road/BNSF grade separation project will improve safety by replacing the existing at-grade BNSF Railway crossing on Barker Road with an overpass. This will allow for the eventual closure of the Flora Road/BNSF Railway crossing.
Estimated cost: $26 million
LEARN MORE